• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
M10 PROTECTIVE ENTRANCE - MAINTENANCE INSTRUCTIONS. - Continued
M10 PROTECTIVE ENTRANCE - MAINTENANCE INSTRUCTIONS. - Continued

Collective Protection Equipment, Fire Direction System, Artillery, \(Tacfire\) An/Gsg-10\(V\), M262
Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
img
TM 3-4240-284-20&P
LOCATION
ITEM
ACTION
INSPECTION/REPAIR
NOTE
Top and bottom
M10 Protective
Entrance
shells
Two technicians are needed for this procedure:
one on theinsideof the entrance and one on the
outside.
Lay erected entrance on its side with door up.
Remove screws (1), pads (2), and retainer
assemblies (3).
Examine top (4) and bottom (5) shells for cracks, par-
ticularly in the area of A.
Change 1 2-62.1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.