• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATION UNDER USUAL CONDITIONS
POST-OPERATION PROCEDURES

Maintenance Manual For Filter/Separator, Liquid Fuel, 50-Gpm, 100-Gpm, & 350-Gpm Page Navigation
  16    17    18    19    20  21  22    23    24    25    26  
img
. .
TM 5-4330-263-13&P
0006 00
Rapid closure of downstream valves or nozzles during fueling with a high-pressure pump can result in
overpressurization of vessel and cause fuel leaks, leading to possible explosion. Failure to follow this
warning may result in injury or death to personnel.
NOTE
Water should be drained from the sump daily, or after each fueling operation. See "Post-Operation
Procedures" on page 0006 00-4 for more information.
Figure 2. Filter/Separator Unit Post-Operation
POST-OPERATION PROCEDURES
1.
When fueling operations are complete, shut down pumping system and close upstream and downstream valves to iso-
late filter/separator.
2.
Open purge valve (figure 2, 1) by turning counter-clockwise.
3.
Place a suitable container under water drain valve (2) and open water drain valve (2) to drain any water that has accu-
mulated in sump.
4.
When all water has drained and green ball in sight gauge (3) reaches bottom, fuel will begin to flow from valve. Close
water drain valve (2).
5.
Dispose of contaminated liquids in accordance with federal and local regulations.
0006 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.