• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER DISTRIBUTION PANEL - MAINTENANCE INSTRUCTIONS. - Continued
POWER DISTRIBUTION PANEL - MAINTENANCE INSTRUCTIONS. - Continued

Collective Protection Equipment, Fire Direction System, Artillery, \(Tacfire\) An/Gsg-10\(V\), M262
Page Navigation
  168    169    170    171    172  173  174    175    176    177    178  
img
. .
TM 3-4240-284-30&P
2-14. POWER DISTRIBUTION PANEL - MAINTENANCE INSTRUCTIONS (Cont).
ACTION
ITEM
LOCATION
REMOVAL/lNSTALLATION
.
REMOVAL
1. Remove nuts (1) and washers (2).
Diode (CR5)
Power Relay
2. Remove diode (3) from power relay (4).
3. Remove six nuts (5) and washers (6) from power
Power relay
Power Distribution Panel
relay and remove wires (7 and 8).
4. Remove four nuts (9), washers (10), and
screws (11 ).
5. Remove power relay.
INSTALLATION
1. Position power relay (4) on panel,
Power relay
Power Distribution Panel
2. Attach with four screws (11 ), washers (10), and
nuts (9).
3. Install wires (7) on terminals Xl and X2 of power
relay. Refer to page 2-169.
4. Install diode (3) between terminal Xl and X2 of the
Diode (CR5)
Power Relay
power relay. Ensure that the end is installed on ter-
minal X2. Secure with washers (2) and nuts (1).
5. Install wires (8) and secure with washers (6) and
nuts (5). Refer to page 2-169.
2-167


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.