• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER DISTRIBUTION PANEL - MAINTENANCE INSTRUCTIONS.
POWER DISTRIBUTION PANEL - MAINTENANCE INSTRUCTIONS. - Continued

Collective Protection Equipment, Fire Direction System, Artillery, \(Tacfire\) An/Gsg-10\(V\), M262
Page Navigation
  164    165    166    167    168  169  170    171    172    173    174  
img
. . . .
TM 3-4240-284-30&P
2-14. POWER DISTRIBUTION PANEL - MAINTENANCE INSTRUCTIONS (Cont).
LOCATION
ITEM
ACTION
REMOVAL/INSTALLATION
REMOVAL
Power Distribution Panel
PE LIGHT or DC POWER
1. Remove two screws (1), washers (2), and wires (3)
circuit breaker
from circuit breaker (4).
2. Unscrew waterproof boot (5).
3. Remove circuit breaker and keying washer (6).
INSTALLATION
1, Place keying washer (6) on circuit breaker (4).
2. Insert circuit breaker in panel and secure with water-
proof boot (5).
3. Connect wires using screws (1) and washers (2).
Refer to page 2-169.
REMOVAL/INSTALLATION
REMOVAL
Power Distribution Panel
208 v indicator light
1. Remove insulation and unsolder connections from
indicator light (1).
2. Unscrew knurled ring (2) and remove indicator light.
INSTALLATION
1. Insert 208 v indicator light (1) in panel and secure
with knurled nut (2).
2. Place insulation sleeving (item 6, app C) over wire
leads.
3. Solder wire leads to 208 v indicator light. Refer to
page 2-169.
4. Place insulation sleeving (item 6, app C) over con-
nection and shrink,
2-163


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.