• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL BOX ASSEMBLY - Continued
FUEL HOSE ASSEMBLY.

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  206    207    208    209    210  211  212    213    214    215    216  
img
Remove two nuts (28) and metal bracket (29) from rear of water pressure
Nuts (28)
dial gage (30). Install water pressure dial gage (30) into control box
Metal bracket (29)
assembly (2) and secure with metal bracket (29) and two nuts (28).
Water pressure dial
gage (30)
Wrap male threads of water pressure dial gage (30) with antiseizing tape
Pipe straight adapter (31)
before installing pipe straight adapter (31).
Position insulation blanket (32) over backside of all three gages. Apply
Insulation blanket (32)
pressure sensitive tape over insulation blanket.
TM 3-4230-209-20&P
2-189


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.