• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL PANEL ASSEMBLY. - Continued
CONTROL PANEL ASSEMBLY. - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  133    134    135    136    137  138  139    140    141    142    143  
img
2-116
TM 3-4230-209-20&P
2-26. CONTROL PANEL ASSEMBLY (CONT).
LOCATION/lTEM
ACTION
REMARKS
Control Panel Assembly/
Electrical leads (31)
Connect electrical leads (31) to terminal board (32). Position terminal
Terminal board (32)
board (32) on rear of control panel (2). Secure with machine screws (33)
flat washers (34), and self-locking nuts (35).
Machine screws (33)
Flat washers (34)
Self-locking nuts (35)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.