• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL PANEL ASSEMBLY. - Continued
CONTROL PANEL ASSEMBLY. - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  136    137    138    139    140  141  142    143    144    145    146  
img
Insert liquid quantity indicator (53) through front of control panel (2). Install
Liquid quantity
bracket (54), nuts (55), and electrical leads (56) on rear of gage.
indicator (53)
Bracket (54)
Nuts (55)
Electrical leads (56)
Insert pressure indicator (57) through front of control panel (2).
Pressure indicator (57)
Bracket (58)
Install bracket (58), nuts (59), and electrical leads (60) on rear of indicator.
Nuts (59)
Electrical leads (60)
TM 3-4230-209-20&P
2-119


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.