Insert liquid quantity indicator (53) through front of control panel (2). Install
Liquid quantity
bracket (54), nuts (55), and electrical leads (56) on rear of gage.
indicator (53)
Bracket (54)
Nuts (55)
Electrical leads (56)
Insert pressure indicator (57) through front of control panel (2).
Pressure indicator (57)
Bracket (58)
Install bracket (58), nuts (59), and electrical leads (60) on rear of indicator.
Nuts (59)
Electrical leads (60)
TM 3-4230-209-20&P
2-119