• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL PANEL ASSEMBLY. - Continued
CONTROL PANEL ASSEMBLY. - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  135    136    137    138    139  140  141    142    143    144    145  
img
TM 3-4230-209-20&P
2-118
2-26. CONTROL PANEL ASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/lTEM
Control Panel Assembly/
Before reassembly, wrap male threads of pressure
Connect pipe elbow (45), vacuum gage (46), and straight adapter (47)
Pipe elbow (45)
gage and straight adapter with antiseizing tape or
together before installing vacuum gage.
Vacuum gage (46)
mat male threads with sealing compound to prevent
Straight adapter (47)
leaks.
Insert machine screws (48) through control panel (2) and slide sleeve
Machine screws (48)
spacers (49) on screws-from rear-of control panel (2). Position vacuum
Sleeve spacers (49)
gage (46) on machine screws (48). Connect electrical lead (50) to top
Electrical lead (50)
machine screw (48). Secure with flat washers (51) and self-locking
Flat washers (51)
nuts (52).
Self-locking nuts (52)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.