• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PERSONNEL SHOWER ASSEMBLY - Continued
PERSONNEL SHOWER ASSEMBLY - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  53    54    55    56    57  58  59    60    61    62    63  
img
TM 3-4230-209-20&P
2-36
2-9. PERSONNEL SHOWER ASSEMBLY (CONT).
ACTION
REMARKS
LOCATION/ITEM
Personnel Shower Assembly/
Disassemble top section (1) by unscrewing quick coupling halves (2) from
Top Sections
pipe with holes (3). Remove gaskets (4).
Disassemble top section (5) by unscrewing quick coupling half (6) and
quick coupling half with female threads (7) from pipe with holes (8).
Remove gasket (9).
Personnel Shower Assembly
Remove dirt, trash, and rust. Clean with hot, soapy water then rinse with
Be sure shower holes are open after cleaning and
painting.
clear water. Paint chipped or worn areas with polyurethane coating, as
necessary.
Personnel Shower Assembly
Replace authorized unserviceable parts.
Personnel Shower Assembly/
Apply antiseizing tape or sealing compound to all male
Reassemble top section (5) by screwing quick coupling half with female
threads before reassembly.
Top Sections
threads (7) and quick coupling half (6) on pipe with holes (8). Place
gasket (9) in quick coupling half (6).
Reassemble top section (1) by screwing quick coupling halves (2) on pipe
with holes (3). Place gaskets (4) in quick coupling halves (2).


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.