Personnel Shower Assembly/
Disassemble lower vertical support (1) by unscrewing quick coupling
Lower Vertical Support
halves (2) from pipe (3). Remove gaskets (4) from quick coupling
halves (2).
Personnel Shower Assembly
Remove dirt, trash, and rust. Clean with hot, soapy water then rinse with
clear water. Paint chipped and worn areas with polyurethane coating.
Replace authorized unserviceable parts. To replace pipe (3), see
PersonneI Shower AssembIy
Reassemble by screwing quick coupling halves (2) on pipe (3). Place
PersonneI Shower Assembly/
Apply antiseizing tape or sealing compound to all male
Lower Vertical Support
gaskets (4) in quick coupling halves (2).
threads before reassembly.
2-37
TM 3-4230-209-20&P