• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PERSONNEL SHOWER ASSEMBLY
PERSONNEL SHOWER ASSEMBLY - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  50    51    52    53    54  55  56    57    58    59    60  
img
.
Disassemble upper center support (1) by unscrewing coupling halves with
Personnel Shower Assembly/
male threads (2 and 3), coupling half with female threads (4), and pipe (5)
Upper Center Support
from pipe tee (6).
Remove dirt, trash, and rust. Clean with hot, soapy water then rinse with
Personnel Shower Assembly
clear water. Paint chipped or worn areas with polyurethane coating, as
necessary.
Replace authorized unserviceable parts. To replace pipe (5), see
Personnel Shower Assembly
figure E-4.
Apply antiseizing tape or sealing compound to all male
Reassemble by screwing pipe (5), coupling half with female threads (4),
Personnel Shower Assembly/
threads before reassembly.
and coupling halves with male threads (2 and 3) into pipe tee (6).
Upper Center Support
TM 3-4230-209-20&P
2-33


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.