• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PROTECTIVE ENTRANCE CONTROL MODULE - MAINTENANCE INSTRUCTIONS. - Continued
PROTECTIVE ENTRANCE CONTROL MODULE - MAINTENANCE INSTRUCTIONS. - Continued

Collective Protection Equipment, Air Defense Command And Control System, An/Tsq-73, M263
Page Navigation
  68    69    70    71    72  73  74    75    76    77    78  
img
TM 3-4240-286-20&P
ACTION
ITEM
LOCATION
From the outside, install loop of connector cover (7) and
nut (5) on cable connector J21 (9). Tighten nuts
securely. From the outside, install loop of connector
cover (6) and nut (4) on cable connector J20 (8). Tighten
nut securely.
Reconnect electrical cable plugs P20 (2) and P21 (3).
REMOVAL
Pull knob (1) from timer shaft (2).
Knob
Protective Entrance Con-
trol Module
INSTALLATION
Aline knob pointer with 0 on panel. Push knob (1) on
timer shaft (2).
REMOVE
Unscrew indicator light (3) from indicator light base (4).
PURGE indicator lamp
Protective Entrance Con-
trol Module
Pull out lamp (5) from indicator light (3).
INSTALLATION
Insert indicator lamp (5) in indicator light (3).
Install indicator light (3) in light base (4).
2-65


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.