• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SKID BASE SUBASSEMBLY. - Continued
CENTRIFUGAL PUMP.

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  117    118    119    120    121  122  123    124    125    126    127  
img
. . .
TM 3-4230-209-20&P
2-100
2-21. SKID BASE ASSEMBLY (CONT).
REMARKS
ACTION
LOCATION/lTEM
Skid Base Subassembly/
Install machine bolt (45) through frame, self-locking nut (46), and into
Machine bolt (45)
alternator bracket (33).
Self-locking nut (46)
Final tension adjustment of V belt (21) will be made when skid base
subassembly is installed into pump unit subassembly.
2-22. PLUMBING ASSEMBLY.
This task covers repair/servicing
INITIAL SETUP
Equipment Condition
Tools and Special Tools
Assembled
Automotive Maintenance and Repair Shop Equipment, Less Power
(SC 4910-95-CL-A72 and SC 4910-95-CL-A74)
References
TM 3-4230-209-10
REMARKS
LOCATION/lTEM
ACTION
Plumbing Assembly
All connections
Organizational maintenance is authorized to tighten all pipe connections
to stop leaks.
Service offset valve (VALVE NO. 1 MANIFOLD) (TM 3-4230-209-10).
Offset valve assembly
Regulating valves
Service regulating valves No. 2 and No. 3 (VALVE NO. 2 LOWER REEL
and VALVE NO. 3 UPPER REEL) (TM 3-4230-209-10).


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.