• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOW PRESSURE HEATING BOILER ASSEMBLY - Continued
LOW PRESSURE HEATING BOILER ASSEMBLY - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  228    229    230    231    232  233  234    235    236    237    238  
img
Low Pressure Heating Boiler
Repair by replacing and cleaning authorized parts.
Assembly/All parts
Low Pressure Heating Boiler
Assembly/
Screw flame thermostatic switch (1) in side of exhaust opening. Install
Flame thermostatic
cover panel if necessary.
switch (1)
Spark arrester (2)
Position spark arrester (2) in exhaust opening and install two machine
Machine screws (3)
screws (3) through side of exhaust opening and spark arrester.
Internal tooth lock
Install two internal tooth lock washers (4) and hexagon plain nuts (5) on
washers (4)
ends of machine screws (3) and secure.
Hexagon plain nuts (5)
TM 3-4230-209-20&P
2-211


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.