• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SKID BASE ASSEMBLY. - Continued
SKID BASE ASSEMBLY. - Continued

Decontaminating Apparatus: Power-Driven, Skid-Mounted, 500-Gallon, M12A1
Page Navigation
  217    218    219    220    221  222  223    224    225    226    227  
img
TM 3-4230-209-20&P
2-200
2-36. SKID BASE ASSEM BLY (CONT).
REMARKS
ACTION
LOCATION/lTEM
Skid Base Assembly/
Install pump return line (24) to pipe-to-tube elbow (16) and pipe-to-tube
Pump return line (24)
Pipe-to-tube tee (25)
tee (25).
Purge and bypass return
Install purge and bypass return line (26) to pipe-to-tube tees (25 and 27).
line (26)
Pipe-to-tube tee (27)
Loop clamp (28)
Slip loop clamp (28) around purge and bypass return line (26). Aline hole.
Machine screw (29)
Install machine screw (29), internal tooth lock washer (30), and hexagon
Internal tooth lock
plain nut (31).
washer (30)
Hexagon plain nut (31)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.