TM 11591522613
Section IV. DIRECT SUPPORT TEST PROCEDURES
6-12. General
These instructions take the form of physical
tests and inspections as well as operational
tests. The performance standards specified for
This section provides instructions for direct
these must be successfully obtained before a
support personnel to determine the operational
unit can be considered serviceable.
readiness of a F-1461/VRC that has been re-
paired.
6-13. Physical Inspection Chart
Tasks
Results
1
Inspect top cover and housing
No damage evident or parts missing.
For damage, missing parts, and
External surfaces to be painted
conditions of paint.
show bare metal. External
NOTE
Touchup painting is recommended instead
of refinishing whenever practical;
and other plated parts will not be
painted or polished with abrasives.
2
Inspect top cover for loose or
All screws are tight; none are missing.
missing screws.
3
Inspect connectors and wiring
No loose parts or damage.
for looseness or damage.
69