Home
Download PDF
Order CD-ROM
Order in Print
MODIFICATION WORK ORDER
PURPOSE.
MODULE(S) (COMPONENTS, ASSEMBLIES, SUBASSEMBLIES) TO BE MODIFIED.
TECHNICAL PUBLICATIONS AFFECTED/CHANGED.
MODIFICATION PROCEDURES.
MATERIAL CHANGE (MC) NUMBER.
Appendix A. REFERENCES - MWO-3-4240-325-12-10009
Appendix B. MODIFICATION PROCEDURES FOR M93 GAS-PARTICULATE FILTER UNIT
M48/M48A1 GAS-PARTICULATE FILTER CANISTER REPLACEMENT FOR M93
INSPECTION
Figure B-2.
Appendix C. MODIFICATION PROCEDURES FOR M1A1/M1A2/M1A2 SEP TANKS
Figure C-1.
Appendix D. MODIFICATION PROCEDURES FOR M109A6 PALADIN
M48/M48A1 GAS-PARTICULATE FILTER REPLACEMENT FOR M109A6 PALADIN
Appendix E. MODIFICATION PROCEDURES FOR M2A3 BRADLEY FIGHTING VEHICLE
REMOVAL
INSTALLATION - MWO-3-4240-325-12-10021
INSTALLATION - MWO-3-4240-325-12-10022
INSTALLATION - continued
Appendix F. RECORDING AND REPORTING OF MODIFICATION FORM
RECORDING AND REPORTING OF MODIFICATION FORM
MWO-3-4240-325-12-1 M48 Gas Particulate Filter (GPF) NSN
4240-01-161-3710
and M48A1 Gas Particulate Filter (GPF) NSN
4240-01-363-1311
Manual